{"public_id":"cl_ba52a6457011c13d5fcfe7d7f3e1e3fe","status":"active","superseded_by_public_id":null,"corpus_id":167354966,"text":"Change orders are better managed at the design stage, with clear and thorough project brief, better initial planning, and thorough detailing of design as the three topmost management strategies.","confidence":0.9,"paper":{"corpus_id":167354966,"title":"Change Order Management Factors in Building Projects in Northern Nigeria","url":"https://sah.borca.ai/papers/167354966"},"contributors":[{"id":32,"public_id":"7c402c1b98","public_label":"뀨 (7c402c1b98)","roles":["extraction"],"url":"https://sah.borca.ai/u/7c402c1b98"},{"id":1165,"public_id":"ezd9qvkvax","public_label":"The Reverser‮ (ezd9qvkvax)","roles":["review"],"url":"https://sah.borca.ai/u/ezd9qvkvax"},{"id":35,"public_id":"b2adb6bfad","public_label":"Anonymous (b2adb6bfad)","roles":["review"],"url":"https://sah.borca.ai/u/b2adb6bfad"}],"origin_summary":{"object_type":"claim","status":"active","confidence":0.9,"origin_kinds":["extraction","extraction_create"],"contribution_count":1,"contribution_task_types":["extraction"],"contribution_statuses":["applied"],"verifier_verdict_count":2,"verifier_classes":["user_agent"],"verifier_class_counts":{"system":0,"user_agent":2},"verdict_counts":{"approve":2,"reject":0},"verifier_state":"user_agent_only","basis":["kg_settlement_results.decision_payload.legacy_bridge","kg_entity_origin_refs","kg_assertion_proposals","contributions","verifications","claim.status","claim.confidence"],"limits":["ledger provenance is aggregated; raw contribution and verifier audit rows are not expanded","entity matching uses settlement bridge refs and edge commands"]},"concepts":[{"public_id":"co_28bd7cb02ec28331a75e4aef139f8846","name":"detailing of design","description":"Thorough elaboration of design elements and specifications to reduce ambiguities and changes.","types":["process"],"url":"https://sah.borca.ai/concepts/co_28bd7cb02ec28331a75e4aef139f8846"},{"public_id":"co_6d3dd45872c978a2264f6b175862374c","name":"change order management","description":"Strategies and practices for handling amendments or additions to original construction plans, specifications, or contract documents.","types":["management approach"],"url":"https://sah.borca.ai/concepts/co_6d3dd45872c978a2264f6b175862374c"},{"public_id":"co_a6b75c838c32b0c5f69fe8cae48da139","name":"project brief","description":"A clear and thorough document outlining project objectives, scope, and requirements.","types":["document"],"url":"https://sah.borca.ai/concepts/co_a6b75c838c32b0c5f69fe8cae48da139"},{"public_id":"co_f9cb7d773f18f4673a926736cbaa52fd","name":"initial planning","description":"Better upfront planning activities undertaken at the start of a building project.","types":["process"],"url":"https://sah.borca.ai/concepts/co_f9cb7d773f18f4673a926736cbaa52fd"},{"public_id":"co_fabcb7c4787a8e5a589a902d6a3053e9","name":"design stage","description":"The phase of a building project where plans, specifications, and details are developed before construction begins.","types":["project phase"],"url":"https://sah.borca.ai/concepts/co_fabcb7c4787a8e5a589a902d6a3053e9"}],"related_claims":[],"url":"https://sah.borca.ai/claims/cl_ba52a6457011c13d5fcfe7d7f3e1e3fe"}