PT. XY produces musical instruments such as Upright Pianos and Grand Pianos. Due to a competitive competition, a good quality product is highly required as well as increasing the production scale. To achieve these objectives, company needs to reduce wastes occurred in its production lines, particularly in the division of sanding panel upright piano (UP) which produces type of PE B1 pianos. High cycle time and lead-time are caused by wastes in UP panel sanding division. Therefore, it is needed improvements to be applied here so that the production lines will be run more effectively and efficiently. This study aims to identify wastes using Value Stream Mapping (VSM) as a tool of lean manufacturing and to implement the improvements using Kaizen. It is found that the wastes are motion and waiting. Furthermore, the improvements (kaizen) are focused on reducing motion and waiting wastes. It is shown that cycle time decreased from 51.16 minutes to 41.90 minutes, work in process or inventory can be reduced to 24 pcs over 32 pcs, and the lead-time is 0.167 days of 0.222 days.
Implementation of lean manufacturing to reduce waste in production line with value stream mapping approach and Kaizen in division sanding upright piano, case study in: PT. X
Published 2018 in Unknown venue
ABSTRACT
PUBLICATION RECORD
- Publication year
2018
- Venue
Unknown venue
- Publication date
Unknown publication date
- Fields of study
Not labeled
- Identifiers
- External record
- Source metadata
Semantic Scholar
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-6 of 6 references · Page 1 of 1
CITED BY
Showing 1-16 of 16 citing papers · Page 1 of 1