Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far East and the USA, in order to identify the similarities between Lebanon and these countries. Seven performance indicators were identified in terms of cost, time, quality, communication, risk and safety to evaluate the performance of 102 residential buildings and tower projects completed in Lebanon. Means and medians of these performance indicators were compared to identify which delivery system performs better regarding each indicator. The results presented in this study show some agreements between different performance indicators when applied to principal project delivery systems in the selected countries.
Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon
Published 2019 in Journal of Industrial Engineering International
ABSTRACT
PUBLICATION RECORD
- Publication year
2019
- Venue
Journal of Industrial Engineering International
- Publication date
2019-12-01
- Fields of study
Business, Engineering, Computer Science
- Identifiers
- External record
- Source metadata
Semantic Scholar
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-9 of 9 references · Page 1 of 1
CITED BY
Showing 1-15 of 15 citing papers · Page 1 of 1