This paper presents a case history of observed performance of highway embankment over soft marine clay in Wenzhou, China. During the embankment construction, the changes of ground settlement, ground displacement, and lateral displacement of subsoil with the construction time were monitored and analyzed. The monitoring results indicate that the ground settlement and lateral displacement of subsoil account for about 75% in the process of embankment construction. The measured maximum values of ground settlement, ground displacement, and lateral displacement of subsoil are 37.88 mm, 21.50 mm, and 23.56 mm, respectively. After the completion of the embankment construction, the settlement gradually tended to be stable. It is suggested that the monitoring data of settlement and displacement of embankment are smaller than the design requirements, and the embankment stability is also ensured.
Observed Performance of Highway Embankment over Soft Marine Clay: A Case Study in Wenzhou, China
Published 2020 in Advances in Civil Engineering
ABSTRACT
PUBLICATION RECORD
- Publication year
2020
- Venue
Advances in Civil Engineering
- Publication date
2020-08-11
- Fields of study
Geology, Engineering, Environmental Science
- Identifiers
- External record
- Source metadata
Semantic Scholar
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-39 of 39 references · Page 1 of 1
CITED BY
Showing 1-6 of 6 citing papers · Page 1 of 1