Prefabricated construction has rapidly developed due to its efficiency and environmental benefits. With the widespread application of the EPC (Engineering, Procurement, and Construction) model, achieving fair and reasonable distribution of profits in prefabricated construction projects under this model has become an urgent issue that needs to be addressed. In response to the limitations of the traditional Shapley value method, this paper introduces input factors, technological factors, and management factors to develop an improved profit distribution model based on entropy-weighted TOPSIS and the Shapley value. A case study is presented to validate the model. Results of the study show that the improved Shapley value method balances the earnings with the actual contribution and achieves a fair and reasonable earnings distribution.
Analysis of revenue distribution of assembly building under EPC model based on entropy weight-TOPSIS improved Shapley value
Yanming Yue,Shuo Wang,Zeli Que
Published 2024 in BioResources
ABSTRACT
PUBLICATION RECORD
- Publication year
2024
- Venue
BioResources
- Publication date
2024-11-13
- Fields of study
Not labeled
- Identifiers
- External record
- Source metadata
Semantic Scholar
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-6 of 6 references · Page 1 of 1
CITED BY
Showing 1-2 of 2 citing papers · Page 1 of 1