Analysis of revenue distribution of assembly building under EPC model based on entropy weight-TOPSIS improved Shapley value

Yanming Yue,Shuo Wang,Zeli Que

Published 2024 in BioResources

ABSTRACT

Prefabricated construction has rapidly developed due to its efficiency and environmental benefits. With the widespread application of the EPC (Engineering, Procurement, and Construction) model, achieving fair and reasonable distribution of profits in prefabricated construction projects under this model has become an urgent issue that needs to be addressed. In response to the limitations of the traditional Shapley value method, this paper introduces input factors, technological factors, and management factors to develop an improved profit distribution model based on entropy-weighted TOPSIS and the Shapley value. A case study is presented to validate the model. Results of the study show that the improved Shapley value method balances the earnings with the actual contribution and achieves a fair and reasonable earnings distribution.

PUBLICATION RECORD

CITATION MAP

EXTRACTION MAP

CLAIMS

  • No claims are published for this paper.

CONCEPTS

  • No concepts are published for this paper.