Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC.
Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode
Published 2014 in Computational Intelligence and Neuroscience
ABSTRACT
PUBLICATION RECORD
- Publication year
2014
- Venue
Computational Intelligence and Neuroscience
- Publication date
2014-11-04
- Fields of study
Medicine, Computer Science, Engineering
- Identifiers
- External record
- Source metadata
Semantic Scholar, PubMed
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-18 of 18 references · Page 1 of 1
CITED BY
Showing 1-21 of 21 citing papers · Page 1 of 1