{"corpus_id":110793057,"paper_sha":"f65766aadb4aaf54f41edde0f6ffc36f576e0afc","doi":"10.1002/J.2334-5837.1991.TB01484.X","arxiv_id":null,"pmid":null,"pmcid":null,"mag_id":2125674490,"dblp_id":null,"acl_id":null,"title":"The Relationship of System Engineering to the Project Cycle","year":1991,"publication_date":"1991-10-01","venue":"","journal":{"name":"","pages":"57-65","volume":"1"},"journal_issn":null,"journal_title":null,"publication_types":[],"pubmed_pub_types":null,"s2_fields_of_study":["Engineering"],"reference_count":0,"citation_count":414,"influential_citation_count":22,"is_open_access":false,"arxiv_categories":null,"arxiv_license":null,"arxiv_journal_ref":null,"mesh_headings":null,"chemicals":null,"comments_corrections":null,"source_flags":1,"s2_open_access_pdf_url":null,"s2_open_access_landing_url":null,"s2_open_access_license":null,"s2_open_access_status":null,"pmc_open_access_pdf_url":null,"pmc_open_access_landing_url":null,"pmc_open_access_license":null,"pmc_open_access_status":null,"unpaywall_open_access_pdf_url":null,"unpaywall_open_access_landing_url":null,"unpaywall_open_access_license":null,"unpaywall_open_access_status":null,"abstract":"Abstract A new way of portraying the technical aspect of the project cycle clarifies the role and responsibility of system engineering to a project. This new three dimensional graphic illustrates the end‐to‐end involvement of system engineering in the project cycle, clarifies the relationship of system engineering and design engineering, and encourages the implementation of concurrent engineering.","claims":[{"public_id":"cl_f237efc8a7c7e5a66496c49d0bbfcc8e","status":"active","text":"A new three-dimensional graphic clarifies the role and responsibility of system engineering in the project cycle.","confidence":0.97,"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/claims/cl_f237efc8a7c7e5a66496c49d0bbfcc8e"},{"public_id":"cl_dd5b9ed8ea2bc221e101a455281c2793","status":"active","text":"The graphic clarifies the relationship between system engineering and design engineering.","confidence":0.94,"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/claims/cl_dd5b9ed8ea2bc221e101a455281c2793"},{"public_id":"cl_52c8331f49fef7fa4086f92aa271ea5b","status":"active","text":"The graphic illustrates the end-to-end involvement of system engineering in the project cycle.","confidence":0.95,"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/claims/cl_52c8331f49fef7fa4086f92aa271ea5b"},{"public_id":"cl_1cf397ccf896812251e2f520b3607a58","status":"active","text":"The portrayal encourages the implementation of concurrent engineering.","confidence":0.9,"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/claims/cl_1cf397ccf896812251e2f520b3607a58"}],"concepts":[{"public_id":"co_324a606740f56d9b3c8cc2e17b1060a8","status":"active","name":"concurrent engineering","description":"An approach in which related engineering activities are performed in parallel to improve coordination.","types":["methodology"],"aliases":[],"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/concepts/co_324a606740f56d9b3c8cc2e17b1060a8"},{"public_id":"co_42bc9c277ecb7a2a665405df344116a7","status":"active","name":"system engineering","description":"An engineering discipline concerned with defining, integrating, and managing technical system development across a project.","types":["discipline"],"aliases":["systems engineering"],"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/concepts/co_42bc9c277ecb7a2a665405df344116a7"},{"public_id":"co_4322c8a230a996a3b985681b67def721","status":"active","name":"project cycle","description":"The sequence of phases and activities that make up a project from start to finish.","types":["process"],"aliases":[],"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/concepts/co_4322c8a230a996a3b985681b67def721"},{"public_id":"co_556398539301cf1a123a9bc80f68a1a9","status":"active","name":"design engineering","description":"An engineering function focused on creating and specifying system or product designs.","types":["discipline"],"aliases":[],"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/concepts/co_556398539301cf1a123a9bc80f68a1a9"},{"public_id":"co_57cb40880e9ebcf4322bc604d8a0162a","status":"active","name":"three-dimensional graphic","description":"A 3D visual representation used to portray the technical aspect of the project cycle.","types":["visualization"],"aliases":["3D graphic"],"contributors":[{"id":1,"public_id":"12632b8b5f","public_label":"Anonymous (12632b8b5f)","roles":["extraction"],"url":"https://sah.borca.ai/u/12632b8b5f"}],"url":"https://sah.borca.ai/concepts/co_57cb40880e9ebcf4322bc604d8a0162a"}],"external_ids":{"DOI":"10.1002/J.2334-5837.1991.TB01484.X","ArXiv":null,"PubMed":null,"PubMedCentral":null,"MAG":2125674490,"DBLP":null,"ACL":null},"open_access":{"is_open_access":false,"pdf_url":null,"landing_url":"https://sah.borca.ai/papers/110793057","source":null,"pdf_url_source":null,"license":null,"reason":"pdf_url_not_indexed"},"reference_availability":{"status":"unknown","references_indexed":false,"full_text_available":false,"full_text_source":null,"count_basis":"semantic_scholar_metadata","extraction_status":"not_applicable","reason":null},"source":{"provider":"episteme2","base_corpus":"semantic_scholar_dump","freshness_mode":"unknown","basis":["semantic_scholar_metadata","postgres_metadata"],"limits":["paper metadata is based on indexed upstream scholarly datasets","claims and concepts are available only for extracted papers","absence of claims or concepts means no extracted graph data is available in this response"],"status":"available","degraded":false,"degraded_reasons":[],"diagnostics":{"status":"available","degraded":false,"degraded_reasons":[],"metadata_status":"available","graph_status":"available","abstract_status":"available"},"source_flags":1},"paper_id":637643,"paper_uid":"13b99622-8c6d-4de5-b2c5-6af3ebd67922","canonical_identity":{"paper_id":637643,"paper_uid":"13b99622-8c6d-4de5-b2c5-6af3ebd67922","identity_status":"available","lookup_basis":"semantic_scholar_external_id","compatibility_path":"corpus_id"},"url":"https://sah.borca.ai/papers/110793057"}