This paper examines three independent explanatory variables and their relation with cost overrun in order to decide whether this is different for Dutch infrastructure projects compared to worldwide findings. The three independent variables are project type (road, rail, and fixed link projects), project size (measured in terms of estimated costs) and the length of the project implementation phase. For Dutch projects, average cost overrun is 10.6% for rail, 18.6% for roads and 21.7% for fixed links. For project size, small Dutch projects have the largest average percentage cost overruns but in terms of total overrun, large projects have a larger share. The length of the implementation phase and especially the length of the pre-construction phase are important determinants of cost overruns in the Netherlands. With each additional year of pre-construction, percentage cost overrun increases by five percentage points. In contrast, the length of the construction phase has hardly any influence on cost overruns. This is an important contribution to current knowledge about cost overruns, because the period in which projects are most prone to cost overruns is narrowed down considerably, at least in the Netherlands. This means that to determine the causes and cures of overruns one should focus on the period.
Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transport Infrastructure Projects
C. Cantarelli,Bert van Wee,Eric Molin,B. Flyvbjerg
Published 2012 in Transport Policy
ABSTRACT
PUBLICATION RECORD
- Publication year
2012
- Venue
Transport Policy
- Publication date
2012-07-01
- Fields of study
Engineering, Business, Economics
- Identifiers
- External record
- Source metadata
Semantic Scholar
CITATION MAP
EXTRACTION MAP
CLAIMS
- No claims are published for this paper.
CONCEPTS
- No concepts are published for this paper.
REFERENCES
Showing 1-16 of 16 references · Page 1 of 1